CE 78 4 H View larger

CE 78 QUICK-SET 4 HOURS


Coating for plasterboard joints, setting time 4 hours

Products designed for making joints in plasterboard.

The various setting times available mean that you can choose the product which is most ideally suited to the surface area of the site. 

VOC: A+. 

BENEFITS

• Ideal in cold and damp weather 
• Beautiful joint finish



 
CE 78 QUICK-SET 4 HOURS
COMPOSITION AND APPEARANCE

Plaster-based powder coating containing calcium carbonate, resin and various additives. 

The mixed paste is white in colour. 


SUITABLE SURFACES

All types of plasterboard with or without insulation (glass wool, rockwool, polystyrene) with tapered edging and plasterboard surfaces. 


COVERING

Sealing undercoat for plasterboard

Plaster-based smooth finish coating


REFERENCE DOCUMENTS

DTU 25.41 and DTU 25.42. NF EN 13963. 

QB N°311-16-732. 


TECHNICAL CHARACTERISTICS

Setting time: 1 hour

Tape adhesion: > 1000 g

Cracking: no cracking up to 5 mm thickness

Density: 0.9

Reaction to fire: A1


PACK SIZE

25 kg bags on shrink-wrapped pallet. 

5 kg bags on shrink-wrapped pallet.


STORAGE

9 months in unopened original packaging stored away from moisture. 


PREPARATION OF SURFACES

The plasterboards must be fixed in accordance with DTU 25.42.

Cuts in boards must be bevelled and free from dust.


QUANTITY OF MIXING WATER

10 to 11 litres of water per 25 kg bag.


APPLICATION

Before treating the joints themselves, cover edges between accidentally non-abutting panels and various fillers (spalls, deterioration in cladding, etc.)

Apply manually by “buttering” the tapering using a 10 or 15 cm filling knife and positioning the tape. (ground surface against the coating).

Then make a finishing pass, allow to dry and finish to mask the tape.

Also mask the screw heads.

Apply a tape in the ceiling, ensuring that the concrete shows no trace of form oil.

If there are vertical angles projecting, use a reinforced tape (frame arrange on the complex side) or a metal angle section.


AMOUNT REQUIRED

Approx. 350 g/m² of boards.


DRYING TIME

Can be repeated 4 hours after application of the first pass.


RECOMMENDED APPLICATION

To avoid the formation of “lint”, do not rub down plasterboard before the sealing undercoat. 

 
Subscribe to our newsletter

Semin takes your privacy seriously

Semin-plaster.com uses cookies, including third-party cookies, on its website to provide you with, analyse, and improve your user experience.

You are free to accept or reject cookies.

By clicking on Personalize cookies , you can learn about how your data is used. For more information, please refer to our cookies privacy policy.

Customize Cookies

Audience measurement

These cookies provide statistics on how many times our website is visited. Turning cookies off prevents us from monitoring and improving our services